On TIME AND ON BUDGET

Solar Project Steps - What to Expect

1. Initial Consultation and Site Evaluation

This initial phase involves assessing your energy needs and evaluating your site's suitability for solar. Factors like roof or land space, shading, and utility interconnection are assessed.

2. Solar System Design and Proposal

Based on the site evaluation, a customized solar system design is created, including the number and type of solar panels, inverters, and mounting systems. This stage also involves generating a detailed proposal with cost estimates and projected energy production.

3. Permitting and Approvals

This involves obtaining necessary permits from local authorities and an interconnection agreement with the utility company. This process can be time-consuming and requires careful documentation. Our in-house teams have experience navigating the intricacies of utility providers to ensure precise information and timely approvals.

4. Installation

Once permits are secured, the physical installation of the solar panels, inverters, and other components begins. This phase includes securing the panels, making electrical connections, and installing monitoring systems.

5. Inspections and Commissioning

After installation, inspections are conducted to ensure compliance with safety and electrical codes. Once the system passes inspection, it is commissioned and activated for operation. This must be completed by December 31, 2027 - meaning projects need to be started ASAP with construction beginning early 2026 to avoid bottlenecks and delays.

6. Ongoing Maintenance and Monitoring

Regular maintenance is crucial to ensure optimal performance and longevity of the solar system. This includes monitoring system performance, cleaning panels, and addressing any issues that may arise.